Commercial Projects
Boggs Engineering Commercial Projects-
Redman Plaza, Plant City
Redman Plaza, Plant City, FL - 9,000 SF strip plaza on approximately 1/4 acre site. Stormwater was accommodated by the installation of an underground stormwater detention system designed to meet the...
Read more -
Southside Farm and Pet Supply
Southside Farm and Pet Supply, Plant City, FL - Site development with the addition of an additional structure on developed site. Site constraints included existing structures and finished floors, wetland, and tractor-trailer...
Read more -
NAPA – Dade City
NAPA - Dade City - Prototype facility without machine shop. Small site with significant fall in the existing conditions. Modified the existing drainage facility to accommodate the additional facility and utilized...
Read more -
NAPA – Ocala
NAPA - Ocala - Prototype facility with machine shop facilities located on a site within a closed drainage basin with high ground water and non-desirable soils. Located along State highway. ...
Read more -
Cape Coral Badcock
Cape Coral Badcock, Cape Coral FL - Site required rezoning of additional parcel to allow for the development. Maximized improvements on site with minimal stormwater requirements. Permitted through South Florida Water Management...
Read more -
Winter Haven Home Depot
Winter Haven Home Depot, Winter Haven, FL - Site development with outparcel on the previous site of a abandoned K-Mart facility. Included master stormwater plan and expedited design and permitting process...
Read more -
Seminole Badcock
Seminole Badcock, St. Petersburg - Site redevelopment of existing site to provide new access for delivery trucks, additional parking, enhanced landscaping and revised drainage....
Read more -
Palatka Home Depot
Palatka Home Depot, Palatka, FL - Existing site had approximately nine feet of fall across area were building is now placed. Significant fill was brought into allow development. Retaining wall permitted...
Read more